DSOB Reconstruction Update March 2024

View from the remote camera today. You can see steel framing at the roof level with decking at the Penthouse floor below. The Penthouse level is getting prepped for concrete next week. You can also see steel framing is started on the north area of the project. In the bottom right corner, you can see the outline of new concrete foundation walls at the stair tower and areaway. These walls are waterproofed and backfill is complete to about 3’ below finished grade.
View from the remote camera today. You can see steel framing at the roof level with decking at the Penthouse floor below. The Penthouse level is getting prepped for concrete next week. You can also see steel framing is started on the north area of the project. In the bottom right corner, you can see the outline of new concrete foundation walls at the stair tower and areaway. These walls are waterproofed and backfill is complete to about 3’ below finished grade.
Steel erection at 2nd floor of Area B, looking down from the Penthouse.
Steel erection at 2nd floor of Area B, looking down from the Penthouse.
Welding baseplates to the top of the existing columns in Area B
Welding baseplates to the top of the existing columns in Area B
This is the floor decking at the Penthouse level. This area will see concrete next week.
This is the floor decking at the Penthouse level. This area will see concrete next week.
Beams and columns at the 1st floor are sprayed with fireproofing materials. The steel only requires this fireproofing to be about 3/4” in thickness to get the rating required.
Beams and columns at the 1st floor are sprayed with fireproofing materials. The steel only requires this fireproofing to be about 3/4” in thickness to get the rating required.
Fireproofing at exterior columns prior to the start of wall framing.
Fireproofing at exterior columns prior to the start of wall framing.
Exterior wall framing starting immediately following the fire proofing material application.
Exterior wall framing starting immediately following the fire proofing material application.
This is a small concrete foundation for the stone “fin” at the south face of the building.
This is a small concrete foundation for the stone “fin” at the south face of the building.
Mechanical and electrical rough-in is nearly completed at the south Corridor at the Basement level
Mechanical and electrical rough-in is nearly completed at the south Corridor at the Basement level
Greenstone material is currently being processed into usable pieces. They are cutting 10 pieces of material at the same time on a 48” diameter saw.
Greenstone material is currently being processed into usable pieces. They are cutting 10 pieces of material at the same time on a 48” diameter saw.