Project Summary
Docking State Office Building Reconstruction
The Docking State Office Building reconstruction project will celebrate the Docking Building’s design legacy as a forward thinking and contemporary design of its time by utilizing advanced design and engineering strategies to achieve energy conservation, improved building comfort, and longevity.
The design will honor the existing Docking Building by salvaging and displaying key historic features and carefully preserving and reusing existing materials throughout the new design in impactful, practical, and creative ways. The significant view to the Capitol Building will be a driving force in the arrangement of the public spaces, indoors and outdoors, and in the daily experience of the building. As a state office building serving the public the design will feel open, transparent and spatially connected.
The project began in November of 2022 and is projected to be complete in April of 2025.