View from the remote camera today. You can see the 11th floor is now removed. Work is shifting to 10th floor and a small portion of 9th floor at the north end of the building.
View from the remote camera today. You can see the 11th floor is now removed. Work is shifting to 10th floor and a small portion of 9th floor at the north end of the building.
You’re the crane operator. This is your view. How’s your depth perception?
You’re the crane operator. This is your view. How’s your depth perception?
You’re the crane operator. This is your view. How’s your depth perception?
You’re the crane operator. This is your view. How’s your depth perception?
Asbestos duct wrap removed from the old air handling unit.
Asbestos duct wrap removed from the old air handling unit.
CMU Block is nearly complete at the Labyrinth walls. Crews are starting on the last two walls in the maze.
CMU Block is nearly complete at the Labyrinth walls. Crews are starting on the last two walls in the maze.
We discovered two fiber optic duct banks that conflict with the new storm sewer alignment. This section required re-engineering.
We discovered two fiber optic duct banks that conflict with the new storm sewer alignment. This section required re-engineering.
This pit was coated with an epoxy system as part of the DWV project.
This pit was coated with an epoxy system as part of the DWV project.