Paused

Clean steel after concrete encasement removed. Steel will be cut with torch and lowered to grade by tower crane.

Preparation of office tower floors for demolition, including removal of lighting ballast and other hazards.

Misc. floor demolition prep early stages, including contractor removal of all abandoned furniture and equipment.

Existing steel columns exposed after concrete removed, prepped for eventual cut and removal with tower crane.

Cleaned and polished limestone and greenstone. Will be reused in Docking projects and considered for other state projects.

Stone sculpture relief being removed from south elevation, excessive weight required secondary ground crane.