DSOB Reconstruction Update 11/13/2023

View from the remote camera today. You can see we are about half complete with the 3rd floor.
View from the remote camera today. You can see we are about half complete with the 3rd floor.
This is over the dock area. The diversion plates are keeping material from dropping below.
This is over the dock area. The diversion plates are keeping material from dropping below.
Loading out material on the west side of the building. We are starting to clean up the area surrounding the building.
Loading out material on the west side of the building. We are starting to clean up the area surrounding the building.
Loading out material on the west side of the building. We are starting to clean up the area surrounding the building.
Loading out material on the west side of the building. We are starting to clean up the area surrounding the building.
The last of the glass is now crushed and bagged. The machines we purchased for this process look like they went to war, but they made it to the end.
The last of the glass is now crushed and bagged. The machines we purchased for this process look like they went to war, but they made it to the end.
Fire sprinkler piping is started in the Basement level.
Fire sprinkler piping is started in the Basement level.
Large ductwork installation is ongoing in the Basement. This is part of the Labyrinth system.
Large ductwork installation is ongoing in the Basement. This is part of the Labyrinth system.
Large ductwork installation is ongoing in the Basement. This is part of the Labyrinth system.
Large ductwork installation is ongoing in the Basement. This is part of the Labyrinth system.