DSOB Reconstruction Update 6/26/2023
Paused

View from the remote camera today. You can see the Penthouse floors are gone now and part of the 12th floor concrete has been removed.

Demolition of the upper Observation Deck roof. Beams are cut and then columns with partial beams still attached are lowered to the ground together.

The diversion plate system is being supported by the tower crane on the 12th floor while concrete at the perimeter beams is removed. Removed material falls to the angled plate and is diverted into the floor below.