DSOB Reconstruction Update 9/17/2023

View from the remote camera today. You can see the 8th floor is now removed. Work is shifting to 7th floor.
View from the remote camera today. You can see the 8th floor is now removed. Work is shifting to 7th floor.
View from the remote camera today. You can see the 8th floor is now removed. Work is shifting to 7th floor.
View from the remote camera today. You can see the 8th floor is now removed. Work is shifting to 7th floor.
Demolition of elevator shaft walls at the 8th floor.
Demolition of elevator shaft walls at the 8th floor.
Structural steel removal. Taking two columns off at the same time.
Structural steel removal. Taking two columns off at the same time.
Large section of boiler flue removed. This is the last section.
Large section of boiler flue removed. This is the last section.
This is the opening from the old flue to the basement Boiler room. We covered the opening with metal decking so it can be patched and roofing installed to permanently close this opening.
This is the opening from the old flue to the basement Boiler room. We covered the opening with metal decking so it can be patched and roofing installed to permanently close this opening.
This is a picture from recent drone video. See the link below for a peek at the video taken.
This is a picture from recent drone video. See the link below for a peek at the video taken.
Hutton Timelapse Video: https://youtu.be/x2q2E8d7-Ow